2026 MISCELLANEOUS IMPROVEMENTS PROJECT
ADVERTISEMENT FOR BIDS
CITY OF LAKEVILLE
DAKOTA COUNTY, MINNESOTA
2026 MISCELLANEOUS IMPROVEMENTS PROJECT
CITY PROJECT NO. 26-01GENERAL NOTICE
City of Lakeville (Owner) is requesting Bids for the construction of 2026 Miscellaneous Improvements Project. Bids for the construction of the Project will be received online through the City of Lakeville's online electronic bid system (BidVAULT) until 10:30 a.m. local time, Thursday, February 26, 2026. At that time bids will be opened and posted publicly by representatives of the City of Lakeville. Bid results and tabulations may be viewed on the City of Lakeville's Public Dashboard at https://mn-ci-lakeville.app.rtvision.com/oneoffice/.
The Project includes the furnishing of all labor and materials for the construction, complete in-place, of the following approximate quantities:
7,100 L F Remove and Replace Concrete Curb and Gutter
8,600 S F Remove and Replace Concrete Walk
37,200 S Y Mill Bituminous Surface
4,500 S Y Full Depth Reclamation
5,350 S Y Trail Removal and Paving
1,350 S Y Parking Lot Removal and Paving
4,515 TON Type SP 9.5 Wearing Course Mix (3,C)
1,000 TON Bituminous Patch Special
100 EACH Adjust Rame & Ring Casting (Sanitary & Storm)
802 S F Prefabricated Modular Block Retaining Wall
3,730 S F Sheet Pile Wall
25 EACH Adjust Gate Valve
80 L F 4"-6" TP Pipe Drain
700 L F 15"-27" RC Pipe
3 EACH 15"-18" RC FES
30 L F Construct Drainage Structures DES 48-4020 & 72-4020
2 EACH Design Special (2'x3')
3,900 C Y Common Excavation
3,900 C Y Common Embankment
1,300 C Y Subgrade Excavation
4,300 C Y Excavation - Channel and Pond
250 C Y Structural Backfill
35,000 S Y Seeding and Restoration
2,500 C Y Aggregate Base Class 5
The bids must be submitted on the Proposal Forms provided in accordance with the Contract Documents, Plans, and Specifications dated February 10, 2026, as prepared by WSB for the City of Lakeville, which are on file with the City Clerk of Lakeville.
The Plan Holder Data project files may be downloaded at https://mn-ci-lakeville.app.rtvision.com/oneoffice/bidding (Projects in Bidding). ONLY REGISTERED PLANHOLDERS WILL BE ALLOWED TO BID PROJECT. Bidders are responsible for all present and future downloads, including addendums and their attachments.
BIDS WILL ONLY BE ACCEPTED BY SUBMITTING AN ELECTRONIC BID USING BIDVAULT at https://bidvault.mn.uccs.com. NO HARD COPY BIDS WILL BE ACCEPTED. Instructions on submitting a bid electronically can be found on the bidVAULT website. The cost to submit a bid is $25 (plus online payment vendor convenience fee).
No bids will be considered unless accompanied by a certified check, or bid bond made payable to the City of Lakeville for 5% of the amount bid, to be forfeited as liquidated damages in the event that the bid be accepted and the bidder fail to enter promptly into a written contract and furnish the required bond.
The Owner reserves the right to reject any and all Bids, waive any informalities in bidding or to accept the Bid or Bids, which best serves the interests of the Owner.
No bids may be withdrawn for a period of 60 days from the date of opening of bids. The City of Lakeville reserves the right to reject any or all bids.
CONTRACTOR ACKNOWLEDGEMENTS:
(1) Any prime contractor or subcontractor that does not meet the minimum criteria established for a "responsible contractor" as defined in Minn. Stat. § 16C.285, subd. 3, or fails to verify that it meets those criteria is not a responsible contractor and is not eligible to be awarded a construction contract for the Project or perform work on the Project.
(2) Responsible contractors shall submit to the City a signed statement under oath by an owner or officer verifying compliance with each of the minimum criteria in Minn. Stat. § 16C.285, subd. 3, at the time that it responds to this solicitation document.
(3) A prime contractor shall submit to the City, upon request, copies of the signed verifications of compliance from all subcontractors.
(4) A false statement under oath verifying compliance with any of the minimum criteria shall make the prime contractor or subcontractor that makes the false statement ineligible to be awarded a construction project and may result in termination of a contract awarded to a prime contractor or subcontractor that submits a false statement.
DATED: February 10, 2026BY THE ORDER OF THE CITY COUNCIL
s/s Ann Orlofsky
City Clerk
Lakeville, MN(Published in Finance and Commerce
February 6, 13, 2026)
4133650